MAYA BLUE E AND F TUNNEL– JAN 2020


January 29, 2020

Volunteers replaced old line in maya blue: all the e tunnel line, f tunnel t left to a tunnel, and f tunnel t right until it gets tight.

Line is on the exact same tie offs except for 1 or 2 spots where the original placement was unstable. In these cases the new line placement is as close to the original spot as possible. Arrows etc were left as is.

The line was truly in bad shape. 5 reels of disintegrating line were removed. Thanks to the diver who called it in for the advice!